Boeing Reports Second-Quarter Results

CHICAGO, July 24, 2019 — (PRNewswire) —
  • Continue to engage global regulators and customers on safe return to service of the 737 MAX
  • Recorded charge and increased costs related to the 737 MAX, as previously announced
  • Revenue of $15.8 billion reflecting 737 MAX impacts and higher defense and services volume
  • Loss of ($5.21) per share (GAAP) and core (non-GAAP)* loss of ($5.82) per share
  • Operating cash flow of ($0.6) billion; paid $1.2 billion of dividends
  • Total backlog of $474 billion, including more than 5,500 commercial airplanes
  • Cash and marketable securities of $9.6 billion provide strong liquidity
  • Previously issued 2019 guidance does not reflect 737 MAX impacts; new guidance to be issued at a future date

 













Table 1. Summary Financial Results

Second Quarter




First Half



(Dollars in Millions, except per share data)

2019


2018


Change


2019


2018


Change













Revenues

$15,751


$24,258


(35)%


$38,668


$47,640


(19)%













GAAP












(Loss)/Earnings From Operations

($3,380)


$2,710


NM


($1,030)


$5,585


NM

Operating Margin

(21.5)%


11.2%


NM


(2.7)%


11.7%


NM

Net (Loss)/Earnings

($2,942)


$2,196


NM


($793)


$4,673


NM

(Loss)/Earnings Per Share

($5.21)


$3.73


NM


($1.40)


$7.88


NM

Operating Cash Flow

($590)


$4,680


NM


$2,198


$7,816


NM

Non-GAAP*












Core Operating (Loss)/Earnings

($3,745)


$2,393


NM


($1,759)


$4,903


NM

Core Operating Margin

(23.8)%


9.9%


NM


(4.5)%


10.3%


NM

Core (Loss)/Earnings Per Share

($5.82)


$3.33


NM


($2.60)


$6.97


NM


*Non-GAAP measure; complete definitions of Boeing's non-GAAP measures are on page 6, "Non-GAAP Measures Disclosures."     


1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12  Next Page »



Review Article Be the first to review this article

Featured Video
Editorial
More Editorial  
Latest Blog Posts
Colin WallsEmbedded Software
by Colin Walls
Variable declarations in C – plenty of pitfalls
Anupam BakshiAgnisys Automation Review
by Anupam Bakshi
AUGER: Celebrating Our Users
2021 EDACafe PredictionsEDACafe Editorial
by 2021 EDACafe Predictions
Atmosic Technologies Electronics Design Industry Predictions
Jobs
Business Operations Planner for Global Foundaries at Santa Clara, California
ASIC Engineer for Amazon at seattle, Washington
Pre-silicon Design Verification Engineer for Intel at Santa Clara, California
Principle Engineer (Analog-Mixed-Signal Implementation) for Global Foundaries at Santa Clara, California
Circuit Design & Layout Simulation Engineer - Co-Op (Spring 2021) for Global Foundaries at Santa Clara, California
Technical Product Manager- SISW-EDA 238452 for Siemens AG at Fremont, California
Upcoming Events
IPC APEX EXPO 2021 Goes Virtual at - Mar 8 - 12, 2021
ISQED'21 - 22nd International Symposium at POB 607 Los Altos CA - Apr 7 - 9, 2021
ADAS Sensors 2021 at The Henry Hotel 300 Town Center Drive Dearborn MI - Apr 7 - 8, 2021
DesignCon 2021 at San Jose McEnery Convention Center San Jose, CA San Jose CA - Aug 16 - 18, 2021
Verific: SystemVerilog & VHDL Parsers



© 2021 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise