Accelerate Lean Manufacturing and Six Sigma During Economic Uncertainty

More than ever, during a distressed economy Lean Manufacturing and Six Sigma initiatives should get high priority emphasis and the necessary resources

FRAMINGHAM, Mass., Nov. 14 /PRNewswire/ -- Lean training for Lean Enterprise Transformation executive seminars by management consulting firm R. Michael Donovan & Co., Inc. ( http://www.rmdonovan.com) attendees are asked to list questions and concerns they want addressed during the seminars. One executive asked: "With a recession and lower revenues likely, how should we continue our Lean Six Sigma transformation?"

"The last good choice during challenging economic times is to pull back on Lean Sigma efforts," says management consultant R. Michael Donovan. In fact, when economic uncertainty is at its worst is when the aggressive pursuit of Lean Sigma can produce high returns by aggressively eliminating waste through perfecting business and production processes. Efforts should be self-funding, improving the company's overall business performance, which is much better than the typical "cut back to survival" mode. Generating higher cash flow is of paramount importance when revenue is threatened.

Overall, the lean consultants at R. Michael Donovan & Co. agree that manufacturers should expect effective Lean Sigma efforts to produce results like:

    --  Cost-to-produce down 20%+
    --  Inventory down 50-80%
    --  Lead times reduced 60-90%+
    --  Cost of quality down 50-70%
    --  99% customer service
    --  Throughput increased by 10%
    --  Revenue and earnings growth at least twice your competition

Jack Rink, a lean consultant and lean training specialist, says, "A company rapidly on its way to becoming a Lean Enterprise is in a much better position to counter the effects of an economic downturn because a Lean Enterprise is flexible, fast and predictable. In addition, the Lean Enterprise has a significant cost advantage and less capital invested than competitors."

Donovan and Rink both emphasized that written project charters should provide for positive returns in 90 days or less with measurable results that link directly to the company's business performance. By doing this you keep leadership immersed in the "game."

About R. Michael Donovan & Co., Inc.

R. Michael Donovan & Co. is an international management consulting and education firm that provides manufacturers and distributors with Lean Manufacturing, Six Sigma, Lean Thinking and Lean Enterprise business performance improvement services on a focused, enterprise-wide, or entire supply chain basis. Website is http://www.rmdonovan.com

    Contact:

    Mike Donovan
    508-788-1100
    rmd@rmdonovan.com

This release was issued through eReleases(TM). For more information, visit http://www.ereleases.com.

Web site: http://www.rmdonovan.com/




Review Article Be the first to review this article
Featured Video
Editorial
More Editorial  
Latest Blog Posts
Bob Smith, Executive DirectorBridging the Frontier
by Bob Smith, Executive Director
Breaking Down Chip Design Functional Verification with Breker’s Adnan Hamid
Anupam BakshiAgnisys Automation Review
by Anupam Bakshi
Welcome Back to DAC – in Person – in San Francisco
Vincent ThibautArteris IP Blog
by Vincent Thibaut
Why Automate Traceability?
Jobs
Pre-silicon Design Verification Engineer for Intel at Santa Clara, California
Sr Engineer - RF/mmWave IC Design for Global Foundaries at Santa Clara, California
Principle Engineer (Analog-Mixed-Signal Implementation) for Global Foundaries at Santa Clara, California
Senior HID Sensor Algorithm Architect for Apple Inc at Cupertino, California
Technical Product Manager- SISW-EDA 238452 for Siemens AG at Fremont, California
Upcoming Events
RISC-V Summit 2021 - Virtually or in-person at Moscone Center West Hall 747 Howard St San Francisco CA - Dec 6 - 8, 2021
Where is the Functional Safety Standard and Why Adopt It? at Design Automation Conference Moscone West, Room 3001 San Francisco CA - Dec 6, 2021
Semicon West Hybrid 2021 at Moscone North and South San Francisco, CA - Dec 7 - 9, 2021
67th Annual IEEE International Electron Devices Meeting at Hilton San Francisco Union Square hotel San Francisco - Dec 11 - 15, 2021



© 2021 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise